1. If maximum marks given for any checkpoint is’S’ Auditor in self audit has given 5 out of 5. What will be the role of sub zone! Zone leader?
2. Who was awarded the Deming prize in 1960 for his contribution in developing technique for industrial optimization?
3. Which outside agencies can be involved in 5’S implementation?
4. Name the concept which is a” study and application group” for learning, development and improvement.
5. While selecting a set of problem through ranking/priority ,what is to be done to ensure that the interest of all members to solve the problem does not get diminished?
6. One of the important features of a particular concept is Treating the “Next process as the customer” What is that concept?
7. Lean is not about
8. How many Quality Circles, one Facilitator can guide?
9. For establishing Total Quality Management in the organization, whose responsibility is to provide long term stability through building up the cadres down the line.
10. As per QCFI, number of checkpoints in self audit should be:
11. If target date is over and action not taken, what to be done by the zone! sub zone leader?
12. Data obtained by count of defects, count of occurrences i.e. no. of accidents etc. can be termed as:
13. Is leadership of Quality Circle rotatable?
14. Name the Activity chart in which start and end dates are written below a reverse triangle
15. Who popularised the Scatter Diagram?
16. The Coordinator is suppose to inform the auditor for ?
17. Why labelling in items is important in 5’S?
18. The results of Trial implementation and regular implementation
19. What is the frequency of doing Seiri
20. Use of which tool/technique helps to improve planning capability?
21. What is the basic objective of Quality Circle?
22. JUSE, Japan has changed one important element in Dr. K. Ishikawa’s definition of Quality Circle, What is that specified?
23. During self audit, auditor should carry for giving marks.
24. In priority/rating method, in case of tie up scores between two projects, how to select problem?
25. For process control, what step should be taken just after analysing the variation?
26. Which one is not used for selection of problem?
27. Whose responsibility is to check the reason if the circle is much behind schedule, as per their Milestone chart?
28. Utility of which of the elementary seven tools can be considered as responsible for the introduction of the New Seven Tools
29. Who is the Certifying agency for 5’S implementation jointly with JUSE
30. When process is under control which type of variation occurs?
31. Lean Quality Circle helps people for:
32. A Quality Circle group made Pareto Diagram of accidents resulting in physical injuries (Finger, Eyes, Arms and legs). Name the Pareto
33. Due to which reason , variation in the dispersion of data occur within the limit of Quality Standards?
34. Dr. Ishikawa renamed the study group as Quality Control Circle in
35. As per Dr Juran, what to be added in evolutionary progress to achieve revolutionary progress?
36. Out of 3 steps of Kaizen, one is Eliminate, other is Change, name the third one.
37. In hich of the following area Kaizen can be implemented?
38. 5’S concepts is the Gate way of ---
39. As per Dr. Juran, for proper adoption of TQM important measures are
40. Meetings of LQC helds :-
41. Out of following tools which one can be used for generating a list of problem?
42. In Lean Quality Circle, Minimum number of Members including the Facilitator will be
43. Which technique maybe used by QC Team for selection of problem?
44. What is not the strategy of Kaizen?
45. During development of solution to the problems the responsibilities for actions within a time frame are assigned by: